Arlong (Leader)
Product Code: OP03-022
Units in Stock: 1
Arlong OP03-022 (Leader)
All cards are 100% genuine and in mint - near mint condition straight from pack.
Cards are packaged in a penny sleeve inside of a rigid top loader
If you would like any pictures of the card, please do not hesitate to contact us!
All cards are 100% genuine and in mint - near mint condition straight from pack.
Cards are packaged in a penny sleeve inside of a rigid top loader
If you would like any pictures of the card, please do not hesitate to contact us!
Units in Stock: 1
Product Code: OP03-022
Brand: One Piece
Product Condition: New
weight: 16.0g
Updating Order Details
Please do not refresh or navigate away from the page!
No Reviews Posted Yet - be the first!